Abstract:
An investigation was conducted into the potential to do demand side management on the
locomotive battery chargers on South African mines. The potential to do load shift and energy
efficiency on new technology battery chargers was examined.
A simulation model was drawn up to simulate the potential to do load shift on the currently
installed battery chargers. This model was further extended to include the high frequency battery
chargers, to enable the simulation of load shift and energy efficiency of these chargers.
Electricity utilisation on the locomotive battery chargers on a mine can be increased from about
50% to 96% by replacing the currently installed ferro resonant chargers with new technology,
high frequency battery chargers. This results in an energy efficient implementation.
It is also possible to realise load shift on these high frequency battery chargers to realise more
electricity cost savings, as well as to reduce the electrical load in Eskom's peak time(s).
Electrical energy cost savings of up to R 442 600 is possible by replacing all the chargers with
high frequency chargers and doing load shift in Eskom's peak times. The payback can be as
short as 2.7 years.
It is also possible to realise load shift on the currently installed ferro resonant battery chargers on
a mine. Annual electrical energy cost savings of up to R 234 200 is possible by implementing
load shift in Eskom's morning and evening peak periods.
A case study was done at Kopanang gold mine to test the simulation model, as well as the
feasibility of these new technology chargers for energy efficiency and load shift. There exist
potential to do energy efficiency and load shift on these chargers, and it was proven possible.
Description:
Thesis (M.Ing. (Electrical and Electronic Engineering))--North-West University, Potchefstroom Campus, 2006.