Show simple item record

dc.contributor.advisorPelzer, R.
dc.contributor.authorGoosen, Pieter
dc.date.accessioned2013-12-02T13:07:18Z
dc.date.available2013-12-02T13:07:18Z
dc.date.issued2013
dc.identifier.urihttp://hdl.handle.net/10394/9660
dc.descriptionThesis (MIng (Computer and Electronic Engineering))--North-West University, Potchefstroom Campus, 2013.
dc.description.abstractIn 2011 South Africa's main electricity supplier, Eskom, experienced a peak electricity demand of 89% of their total installed generation capacity. The high utilisation rate makes it difficult to perform essential maintenance on the system. Eskom implements Demand-Side Management (DSM) projects in various industries, in order to reduce the demand and to ensure sustainable electricity supply. The mining sector consumes 14.5% of the total amount of electricity generated by Eskom. Mine compressed air systems can consume as much as 40% of a mine's total electricity requirements. This makes mine compressed air systems an ideal target for DSM. Electricity load seems to be reduced, but many DSM savings are not sustained throughout the project lifetime. An existing project feedback method of a specific Energy Services Company (ESCo) includes the manual collection of data from the mines and manual generation of reports. These reports show energy savings of the DSM projects to help the ESCo and their clients to improve and sustain the performance of the projects. A great amount of man-hours is used which results in large time delays in the feedback-loop. In order to address this, the need for a new automatic feedback reporting system was identified. This study mainly focusses on the development and implementation of a new method to monitor DSM savings on mine compressed air systems. It includes the reliable collection of data from mines, processing and storing of the data in a central database and generating savings reports. This is done automatically on a daily basis. In order to complete the feedback-loop, the reports are verified and emailed to clients and ESCo personnel on a daily basis. The new reporting system is implemented at a number of mines. Four of these project implementations are used as case studies to measure and interpret the effectiveness and value of this system. It saves a significant amount of man-hours and proves to be of great value in the sustainability of DSM project savings. Both Eskom and mining companies benefit from the efficient monitoring of mine compressed air savings.en_US
dc.language.isoenen_US
dc.publisherNorth-West University
dc.subjectMine compressed air savingsen_US
dc.subjectelectricity savingsen_US
dc.subjectDemand-Side Management (DSM)en_US
dc.subjectreporting systemen_US
dc.titleEfficient monitoring of mine compressed air savingsen
dc.typeThesisen_US
dc.description.thesistypeMastersen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record